  1. G

    Madera Electrify America DCFC Station Underway

    Others say the delays are a permitting issue, after all this California, things take longer. Nothing on Plugshare about the Madera EA site being open, unless I happen to get by there, can't see wasting any time checking on the site even though I'd like to let the EV community know when it's...
  2. G

    Madera Electrify America DCFC Station Underway

    No construction occurring on EA Selma WalMart site, any observed construction is for a carwash. No observable change in EA Madera WalMart site, work occurring in areas not observable amid loud construction noise. No contact could be made with workmen and this poster could not remain in the area...
  3. G

    Amusing email received from Chevrolet

    OH yeah! So, have you got the emails for oil changes? Really, their promotions are always based on their ICEV inventory not the Bolt.
  4. G

    Madera Electrify America DCFC Station Underway

    Recently checked the Madera & Selma Wal-Mart Electrify America installations. The chargers are installed in the Madera location. It looks ready to go, probably awaiting permits. No noticeable construction on chargers occurring at the Selma Wal-Mart location, although there was lots of...
  5. G

    Madera Electrify America DCFC Station Underway

    Checked on construction today, two workman were there. There didn't seem to be much progress, even though some of the equipment crates were moved around. A workman said the expected completion date would be late January, early February. Left photos on Plugshare...
  6. G

    Madera Electrify America DCFC Station Underway

    Well, just got through opining about construction occurring in the central California coast region (see below) and am hopeful that Electrify America is learning as they go. Your word of warning is a sobering reminder that the adoption of new technology might come with more than a fair share of...
  7. G

    Madera Electrify America DCFC Station Underway

    Today, I checked for construction at the Selma Wal-Mart location. I was unable to locate any signs. Since Plugshare is indicating that there will be 7 CCS/SAE and 1 CHAdeMO plugs, the footprint for the construction would be noticeable, I would think. It was busy there due to the holidays, so I...
  8. G

    Madera Electrify America DCFC Station Underway

    I’ve leased my 2018 Bolt for the past six months and have really enjoyed reading the posts on this forum. I’ve especially been interested in new charging stations that are being constructed by Electrify America, especially those in Madera and Selma since I reside in Fresno. It’s not so much that...